🔥 Most requested
Electrical Panel & Service Upgrade
$1,800 – $3,500
Typical range in NYC · 200A upgrade
NYC's older housing stock means most panel jobs are more complex than the national average. Co-op buildings, permit requirements, and ConEd coordination all affect price.
Full cost breakdown →
⚡ High demand — 2026
EV Charger Installation
$450 – $1,200
Level 2 home charger · NYC installed
NY State and federal incentives can cut your out-of-pocket cost significantly. We break down what's covered, what isn't, and why NYC costs more than the suburbs.
Full cost breakdown →
🏗️ Residential & commercial
Generator Installation
$3,000 – $15,000
Standby generator · NYC installed
Post-Sandy demand and NYC DOB permit requirements make generator installation a multi-step job here. We cover standby vs portable, propane vs natural gas, and co-op approval.
Full cost breakdown →
📋 Required by NYC law
Electrical Inspection
$250 – $600
Residential safety inspection
NYC Local Law 97 and certificate of occupancy requirements mean inspections are often mandatory — not optional. We explain when you need one and exactly what it covers.
Full cost breakdown →
🏢 Office · Retail · Restaurant
Commercial Electrical
$85 – $150/hr
Commercial electrician rate · NYC
Commercial jobs in NYC involve union vs non-union considerations, DOB permits, and tenant improvement work. We break down hourly vs project pricing, and what drives scope.
Full cost breakdown →
💡 Indoor · Outdoor · Commercial
Lighting Installation
$120 – $800
Per fixture · NYC installed
Recessed lighting, chandeliers, under-cabinet, exterior, and smart lighting all have very different cost profiles. Labor is the largest variable in NYC — we show you why.
Full cost breakdown →
🚨 Available 24 / 7
Emergency Electrical Repair
$120 – $500+
Service call + repair · NYC
After-hours and emergency rates in NYC can be 1.5–2× standard labor. We explain exactly what's covered in a service call, when to call vs wait, and how to avoid price gouging.
Full cost breakdown →
🏠 Pre-war specialty
House Rewiring
$2,500 – $35,000
Whole-house or partial · phased
Whole-house and partial rewiring, knob-and-tube replacement, and per-square-foot costs. NYC pre-war buildings run higher due to plaster preservation and access.
Full cost breakdown →
📱 Modern upgrade
Smart Home Wiring
$450 – $10,000+
Smart switches to whole-home
Smart switches, whole-home lighting control, and automation — including the no-neutral solutions pre-war NYC apartments need.
Full cost breakdown →
🔌 Everyday job
Outlet & GFCI Installation
$120 – $450+
Per outlet · less when batched
GFCI outlets, USB outlets, two-prong-to-grounded upgrades, and new outlets. Batch several in one visit to save on the per-outlet cost.
Full cost breakdown →
🔧 Common fix
Circuit Breaker Replacement
$150 – $450
Per breaker · standard to AFCI/GFCI
Standard, AFCI, and GFCI breaker replacement — plus honest guidance on when a tripping breaker means a panel upgrade instead.
Full cost breakdown →
🛡 Best value
Whole-House Surge Protection
$300 – $900
Whole-house · less bundled
Panel-level surge protection that guards everything a power strip can't. Cheapest when added during a panel upgrade.
Full cost breakdown →
🏢 Co-op & condo
Apartment Electrical
$120 – $20,000+
Small jobs to full modernization
Co-op and condo electrical — in-unit panel upgrades, rewiring, and board-approved work. We handle the alteration paperwork.
Full cost breakdown →
Real ranges for a master-licensed NYC electrician — what work actually runs across the five boroughs in 2026. Treat these as starting brackets; your final number depends on the variables below.
Ranges assume standard NYC conditions and exclude unusual access, asbestos abatement, or historic-preservation requirements. Every job is quoted in writing after we see the panel and the run.
Two similar-sounding jobs can differ by thousands. These are the concrete factors that determine where in the range your project lands:
Distance from the panel
The single biggest swing. Every extra foot of conduit adds both material and labor. A run that sits back-to-back with the panel — a garage or utility wall — is the cheapest possible job.
Panel capacity (amperage)
Heavy loads like Level 2 EV charging need 240V on a dedicated 40–60A circuit. If your panel is maxed out at 100A, you may need a service upgrade first, which adds roughly $1,500–$4,000+.
Hardwired vs. receptacle
A NEMA 14-50 outlet can shave a little off hardware, but current code often pairs it with a GFCI breaker. Hardwiring a charger directly is generally more reliable and saves on the receptacle hardware.
Site access — indoor vs. outdoor
Outdoor installs, fishing wire through finished walls, basements, or underground runs all take more time and material, pushing labor toward the high end.
Permits & inspections
Most NYC electrical work needs a DOB (and sometimes DEP) permit and inspection, which adds roughly $50–$300+. We file it as part of the job.
Building age — the “old-house tax”
Pre-war NYC stock means plaster-and-lath walls, rigid conduit requirements, and legacy knob-and-tube or cloth wiring — all of which add labor newer construction doesn’t.
Coordination & building rules
Co-op and condo approvals, ConEd scheduling, parking, and freight-elevator logistics add real time on larger and multi-family jobs.